Initiative

Objective

Progress/current activities

Phase 1: a 500kWp solar photovoltaic plant

at Clearwater Mall

Phase 2: plant increased to 1 500kWp

The plant started operating in November 2014.

Phase 1 was commissioned between November 2014 and

June 2015, and the plant generated 510 729kWh, equating to a

saving of 208 tonnes of coal.

From August 2015, phase 1 and 2 have a generating capacity

of 2,5GWh.

Capital replacement programme

Ensures capital equipment at the end of its lifecycle is

replaced with energy-efficient equipment against the

following criteria: non-ozone-depleting refrigerant gas;

reverse cycle heating instead of electrical element heating;

and performance co-efficient 3,5 or better.

All capital replacements are approved by the national

technical manager. At Somerset Mall, three package units

are replaced every year. Only non-ozone-depleting R410

refrigerant units with a co-efficient of performance of 3,5

or better are installed. At Canal Walk, one-third of console

units are replaced annually with R410 refrigerant and energy-

efficient inverter units.

Modify thermostat set points and supply

temperature for chiller water

Lower energy costs in winter and summer.

Malls with Building Management Systems (BMS) installed,

enabled implementation.

Variable speed drives (VSDs) for heating,

ventilation and air-conditioning (AC)

systems

Match speed to required output to reduce consumption.

All relevant systems fitted with VSDs.

LED lighting and occupancy sensors

Improve lamp life and reduce required power factor

correction.

All mall common areas fitted with LED lighting.

Implement preventive maintenance

programmes

Ensure optimal operation of equipment.

All equipment is serviced monthly in line with service level

agreement.

Peak energy demand reduction

Reduce power consumption in peak periods (premium

tariff) and avoid expensive peaks, reducing the cost of

consumption.

Buildings that would benefit from time-of-use tariffs have

been converted to this structure.

Power factor correction

Reduced consumption (in kVA), which accounts for current

and pressure.

Power factor correction technology installed at all buildings

where appropriate.

Light-coloured surfaces

Buildings absorb less radiant energy, reducing solar heat gain

and reliance on artificial light.

By using heat-reflective paint on the roof at Woodland’s

Boulevard, we reduced peak load Air Conditioning (AC)

consumption by 16%.

Insulating duct and pipework for heating,

ventilation and AC

Reduce loss of cold air from AC systems into building

environment.

Ongoing and monitored monthly through service level

agreements.

Architectural shading and external planting

Reduce solar gain and energy use.

Implemented at Rosebank Mall and Canal Walk as part of

extensions and refurbishments.

Current energy and carbon emission savings initiatives

The table below highlights ongoing opportunities to manage water more efficiently.

Initiative

Objective

Benefits

Progress

Smart metering

To improve measuring and

monitoring of water consumption

and identify leaks from unusual

flow patterns.

Q

Anomalies immediately flagged, limiting risk and

consequential loss

Q

Accurately tracking consumption patterns optimises financial

benefits of time-of-use tariff

Q

Balancing sub-meters back to bulk meter at all times to flag

any bypassing

Bulk check meters installed at certain

sites.

Fire system water

consumption

Identify leaks and illegal use of

water.

To save water and avoid the abuse of infrastructure.

All buildings monitored.

Water efficiency initiatives